Completed
Budget
$1.781 million
Scope of Work
The scope consists of the replacement of the existing 10-inch diameter waterline along the northwest side of FM 518, from I45 to just west of SH3, with a new 12-inch diameter waterline. The total footage of waterline to be replaced is estimated to be approximately 5,440 linear feet of 12-inch water mains, plus 1,750 linear feet of 8-inch and 6-inch tie-in/branching lines, including cased water line crossings of FM 518. The project includes three drainage channel crossings that are proposed to be crossed using horizontal directional drilling methods. The proposed waterline will be installed within the general alignment area of the existing waterline.
Subdivisions, Areas, or Streets Impacted
FM 518 between I45 and SH3
Project Status as of August 2023
The project is complete.
Project Manager Contact Information
Anthony Talluto
Phone: 281-554-1451
Email Anthony Talluto